Carrying out Runway 13-31 Resurfacing & Airfield Improvements.
Client is seeking to appoint a suitable experienced contractor to execute required works on design and build basis. The Works shall include but not limited to:
1 - Resurfacing, construction and rehabilitation of Runway 13-31 as per already completed & approved design which represents approximately 74% of overall scope. The balance 26% represents the works associated with design, construction and rehabilitation of Runway strip and Runway End Safety Area (RESA), Taxiway Shoulders on T1/T2/T3/T4/T5 and main Taxiway shoulder T and new Intermediate Holding Position (IHPs) on the main taxiway T.
2 - Runway 13-31 resurfacing (milling and overlay) shall meet Code 4D requirements;
3- Runway resurfacing for transverse and longitudinal slopes shall be made compliant with GCAA CAR IX;
4 - Construction of Runway shoulders shall meet Code 4D requirements; including removal and reinstate AGL Light Fittings, Earth & Secondary Cables
5 - RESA resurfacing 100m for both sides to match existing overrun with new runway levels;
6 - Compaction and slope grading of Runway Strip 140 meters on both sides of the runway centreline, compliant with CAR IX requirements (Design and Build);
7 - Compaction and slope grading of Runway End Safety Area (RESA) 140 meters wide on both sides of the extended runway centreline, compliant with CAR IX requirements (Design and Build);
8 - Maintain the current Category of AGL;
9 - Create new Intermediate Holding Position and Stop Bars for aircraft with tail heights exceeding 7m (Design and Build);
10 - Taxiway T, T1 – T5 shoulder resurfacing / reconstruction to meet Code 4D overall with of 34m (23 meters taxiway and 5.5 meters shoulders on both sides) including removal and reinstate AGL Light Fittings, Earth & Secondary Cables (Design and Build);
11 - Perform Flight Checks and calibrations.
Further details of scope of works will be provided in RFP documents.
Site Requirement:
Respondents attention is drawn towards the nature of the Site is a partially live operational airport limited to Police Air Wing Helicopters operation, that will require strict Environment, Health, Safety, Security and Site restrictions adherence with the Employer's requirements. Runway Operations Closure duration shall be limited to maximum of 70 Days and appointed Contractor must achieve completion of Runway and Taxiway works construction including GCAA CAAP 59 Step 3 approval, flight calibration and check & approval within 70 days from the overall project duration of 192 Days.
Contact Person - Bhati Farooq ([email protected])
Hilal Bil Badi & Partners Contracting Co. WLL - HILALCO has been awarded the main and MEP contract on this scheme.
Bids are currently under evaluation for the main contract on this scheme.
August
09
2022
Tuesday
LAST UPDATED
Project Activity type | Date |
---|---|
Contact awarded to - | Login to access |
Main Contractor | |
Project Stage - | Login to access |
Under Construction | |
Scheduled - | Login to access |
Completion date |
QatarTenders.com is an exclusive subscriber-based portal, established in 2001 with aimed at providing information easier to access and assisting business to find new opportunities.
Projects Intelligence: Up-to-date information about projects from concept stage to execution and completion covering Client, Consultant, Contractor and Key Contact details for all major industries in Qatar.
Tender Announcement: Covers information for RFPs, RFQs, EOI, pre-qualifications and procurement notices issued from various government & public organizations in Qatar.